4D construction progress with Primavera P6 and BIM

Add your Primavera P6 schedule and your BIM model, and watch your project being built in the order you planned. Planned and actual progress sit on the same 3D map, so delays become places you can see, not just lines in a Gantt chart.

Villa community map with units coloured red and green to show construction progress

What 4D means

In Building Information Modelling, the fourth dimension is time. A 4D model links every activity of the construction schedule to the elements of the 3D model that the activity builds: the foundations of block A, the third-floor slab of tower 2, the façade of the clubhouse. Once the link exists, the schedule can be played as an animation, and progress can be read on the model itself.

How GRAVITY TWIN builds the 4D model

  1. Your schedule. You add your Primavera P6 schedule as an XER file, with its activities, dates and Work Breakdown Structure (WBS).
  2. Your model. You add your BIM model (Revit or IFC) or the 3D model of the development.
  3. The link. Activities are linked to the parts of the model they build through the WBS, so the schedule and the model describe the same work.
  4. The timeline. You play the timeline and watch the project being built in the planned order, activity by activity.

Planned versus actual, on the same map

A schedule shows what should happen. Progress reports show what did happen. In the 4D twin both appear on the same model, so the project team and management can compare planned with actual progress for each building, floor or zone, and see at once where work is ahead, on time or behind.

This changes the progress meeting. Instead of reading a long report, the team opens the twin, moves the timeline to today's date and discusses the places where planned and actual differ.

Who uses it

Works with the rest of the twin

The 4D layer lives on the same digital twin as the availability and sales map, so management can compare how a phase is selling with how it is being built. Add 5D cost to read progress in money as well as in time.

Questions and answers

Which schedule format do you use?

Primavera P6 schedules as XER files, with their activities and Work Breakdown Structure.

Do we need a full BIM model?

A BIM model (Revit or IFC) gives the most detailed link between activities and elements. The team reviews the data you have and agrees the level of detail with you.

Can we compare planned and actual progress?

Yes. Planned and actual progress are compared on the same map, activity by activity.

See your project as a live digital twin

Book a 30-minute online demo and we will show you GRAVITY TWIN on a real project.

Book a demoWhatsApp