5D cost on the digital twin

When cost is linked to the same activities and elements as the schedule, progress can be read in money as well as in time. 5D brings cost into the digital twin, next to construction progress and sales.

Villa community map with units coloured by developer, shown in the GRAVITY TWIN platform

What 5D adds

3D is the model, 4D adds time, and 5D adds cost. In a 5D model, quantities and cost are linked to the activities of the schedule and to the elements of the model. The result is a single view in which management can see what has been built, what it cost and what remains to be built and paid.

Why put cost on the model

Cost reports and the schedule are usually separate documents, prepared by different teams at different times. When both are linked to the same 3D model:

How it works with 4D

5D builds on the 4D construction progress layer. The schedule (Primavera P6, XER) is linked to the model through the WBS; cost data is then attached to the same activities and elements. Your team decides which cost data to bring in and how often it is updated.

Sales and cost, side by side

Because the 5D layer sits on the same twin as the availability and sales map, management can look at a phase from three angles at once: how much of it is sold, how much of it is built, and what it has cost so far.

Questions and answers

Do we need 4D before 5D?

Yes. Cost is attached to the activities and elements that the 4D model already links, so 5D starts from a 4D model.

Which cost data can be used?

Quantities and cost per activity or element, from your cost-control system or from Excel or CSV lists. The team reviews your data and agrees the structure with you.